• Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
  • Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
  • Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
  • Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
  • Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
  • Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

After-sales Service: Replace
Warranty: 1 Year
Connection: Grooved
Shape: Equal
Head Code: Round
Angle: 90 Degree
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2015

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
STR-EB
Wall Thickness
Sch80
Material
Stainless Steel
Technics
Casting
Color
Silver
Application
Pipe Connection
Feature
Easy Assemble
Certificate
ISO9001
Working Pressure
1200psi
Transport Package
Wooden Case
Specification
3/4′′ - 3′′
Trademark
Suntex
Origin
China
HS Code
7307290000
Production Capacity
10000sets Per Month

Product Description

Product Description

HIGH PRESSURE DUPLEX STAINLESS STEEL GROOVED PIPE FITTINGS

Designed to provide rugged, corrosion resistant components for grooved end stainless steel piping systems. Couplings and fittings are investment cast in 2205 / 2507 grade duplex / super duplex stainless steel. Available in 3/4" - 3" sizes. 


Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

 
Flexible design enable sealing under pressure

Usage: Widely used for connecting the membrane housing in water treatment equipment
             Also for the connection of grooved end pipe for speed and easy assemble & sealing

Working pressure: PN40/80, 600PSI/1200PSI

Materials: 2205/2507

Size: 3/4"-6"

End connection: groove end

Working temperature: 0-80 degree

Surface Finishing: SATIN (SSS) OR MIRROR (PSS)


Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow
Norminal Size Pipe OD Working Pressure R=1.50D Weight(kgs)
3/4'' 26.9 1200psi 40 0.38
1'' 33.1 1200psi 50 0.55
1-1/4'' 42.4 1200psi 64 0.65
1-1/2'' 48.3 1200psi 72 0.73
2'' 60.3 1200psi 90 1.3
2-1/2'' 73 1200psi 110 2.3
3'' 88.9 1200psi 133 3.5

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

PACKING AND SHIPPING

Packing Details : In Plywood Case
Delivery Details : 30 days after order confirmation

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow


COMPANY INTRODUCTION

Suntex Metals Co., Ltd.,a branch of Suntex Import & Export trading Co.,Ltd., is a leading producer of valves and pipe fittings for water,( including DRINKING water supply),gas and oil fields. Founded by more than 15-year experienced experts on water line products, we own a full equiped factory include epoxy coating line and a lost wax foundry. 

Our products include EN545 ductile iron pipe fittings, air valves,service valves,gate valves, butterfly valves, flange adaptors, couplings, repair clamps, saddles, stainless steel valve/pump parts and stainless steel decorative products such as handrail fittings and glass facade elements.We invite you to browse our web sites for more information about our products and services.Please be noted that other sizes,dimensions and specifications for our products are available upon request.


Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

CERTIFICATIONS

Super Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

CUSTOMER PHOTOS


Super Duplex Stainless Steel 2205 2507 High Pressure Grooved ElbowSuper Duplex Stainless Steel 2205 2507 High Pressure Grooved Elbow

FAQ

Q: ARE YOU TRADING COMPANY OR MANUFACTURER ?

A: We are factory.

Q: HOW LONG IS YOUR DELIVERY TIME?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: WHAT IS YOUR TERMS OF PAYMENT ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.

If you have another question, pls feel free to contact us.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2015

Suppliers with verified business licenses

Trading Company
Number of Employees
15
Year of Establishment
2002-01-29